Skip to content
ThakaaMed
Product

SAIF AI Factory

One platform to prepare medical data for AI: ingest and structure it, then label, train, and validate, in the cloud or on your own servers.

SAIF, the Saudi AI Factory, is where medical AI gets built. It brings raw medical data in, removes Protected Health Information, structures it, and gives clinical experts the tools to label it, then supports model training and validation on the same platform. We built it for our own models, and now license it to AI teams, researchers, and healthcare organizations in Saudi Arabia and the region.

Key Features

What SAIF does

  1. Ingest Medical Data

    Bring in X-ray, CT, MRI, and retinal images in 2D and 3D, directly from PACS or as DICOM, NIfTI, JPEG, PNG files.

  2. Structure and De-identify

    Patient identity is removed and data is organized into consistent datasets before labelling starts.

  3. Label Faster, With AI Assistance

    Bounding box, polygon, brush, spline, keypoint, and measurement tools, from classification to pixel-level segmentation. AI pre-annotation speeds up each project as it learns.

  4. Clinical Quality Review

    Peer, blind, and double-reading review, with AI checks that catch inconsistencies before a dataset is finished.

  5. Train and Validate

    Use the labelled data to train models and validate their performance on the same platform.

  6. Teams, Security, and Deployment

    Role-based teams, live project tracking, and deployment in the cloud or on your own servers, with data kept in the Kingdom.

Inside SAIF

From labelling project to reviewed image.

Projects

Every labelling project in your organization.

The project dashboard shows every labelling project in your organization and how far each one has got: images labelled, what is in progress, and what is still to start.

Annotation workspace

Where labellers do their work.

Labellers annotate each image with polygons, brushes and measurements, add comments and tags, and send their work for review, all in one workspace.

Core Benefits

Why teams use SAIF.

Datasets You Can Trust

Multi-level clinical review gives every dataset the consistency medical AI needs.

Faster Projects

AI-assisted labelling and live project tracking shorten every stage, from the first image to the finished dataset.

Proven on Our Own Models

SAIF prepared the data behind Dental IQ, which holds SFDA authorization. It's the same platform you license.

Technical Specifications

The details

Modalities supported+

X-ray, CT, MRI, mammography, retinal imaging, dental imaging, and ultrasound. 2D and 3D imaging both supported, with native DICOM, NIFTI, and PACS connectivity.

Annotation toolset+

Bounding box, polygon, brush, spline, keypoint, measurement, classification labels, and free-form notes. Pixel-level segmentation and 3D volumetric annotation are available for the modalities that require them.

Quality control+

Multi-tier review pipeline (peer, blind, double-reading), automated consistency checks, inter-annotator agreement metrics, and dashboards for project-level QA reporting.

Deployment model+

Cloud, on-premise, or hybrid. Regulated healthcare customers typically deploy on-premise to keep clinical data inside their security perimeter.

Integration interfaces+

DICOM C-STORE and C-FIND for image ingestion, PACS adapters for direct study pull, REST APIs for dataset export, and S3-compatible storage targets for downstream training pipelines.

Security posture+

AES-256 at rest, TLS 1.3 in transit, RBAC, comprehensive audit logging. On-prem deployments isolate from the public internet by default; cloud deployments support Saudi-region data residency for PDPL alignment.

Throughput envelope+

Project-level throughput is set by your annotator headcount and modality complexity; smart segmentation reduces per-image time by ~60% on supported tasks.

Integration Information

Fits into the systems you already run

PACS

DICOM-native ingestion from any major PACS.

Storage

S3-compatible export targets for downstream model training pipelines.

Training Stack

Exports compatible with major medical-AI training frameworks.

On-premise

Self-hosted deployment for regulated environments needing full-tenant isolation.

Cloud

Saudi-region cloud deployment, PDPL-aligned.

FAQ

Frequently Asked Questions

Customers typically see annotation cost reductions of 30–40%, project completion in weeks instead of months, and substantial improvements in downstream model performance. The ROI compounds as smart-segmentation models adapt to your specific use cases over time.

Related Resources

Read more

All resources
Trust & Compliance

Built on a clinical-grade foundation

ISO 13485:2016

Medical-device quality management system

ISO/IEC 27001:2022

Information security management system in implementation

IEC 62304

Developed under an IEC 62304-compliant software lifecycle

In-Kingdom hosting

On-premise or Saudi-region deployment — customer's choice

AES-256

Encryption at rest; TLS 1.3 in transit

PDPL

Saudi Personal Data Protection Law compliance

HL7 FHIR R4

Clinical data exchange on the FHIR R4 standard

DICOM

Native DICOM imaging interoperability